Block D

Block D

Property Type

Flat in a block

Size

1 - 2 bedrooms

Follow the progress of Block D from the first brick!

5
In progress
Screed
The first fix
Closing up the walls and dry lining
The first coat of paint
The second fix
Kitchen and bathroom installation
Wall tiling
Powering up
Decoration and flooring
Key:
To start
In progress
Completed
Key:
To start
In progress
Completed

Internal fit-out

Start October 2024Expected to end TBC

Status: in progress

From the outside at least, the buildings will soon begin to look like a finished article. Soon, families will start to move in, but before that, the building needs an interior. There are walls, a roof, and windows, but there is still a good deal of work to be done before residents move in.

This milestone includes

Screed

Start January 2025Expected to end January 2025

At this stage, a concrete finisher performs a process called screeding. This involves cutting off excess wet concrete to bring the top surface of a slab to the proper grade and smoothness.

The first fix

Start October 2024Expected to end April 2025

Now that the house has a structure, workers will install the essential components to make it a home. This includes the electrics, plumbing and ventilation. Part of the first fix is the installation of cables, wires, pipes and other hidden fixtures.

Closing up the walls and dry lining

Start April 2025Expected to end May 2025

Before the second fix, plasterers will carefully close up and finish the interior walls.

The first coat of paint

Start June 2025Expected to end TBC

Now that the plaster is dry and much of the internal work has been done, the decorators will apply the first coats of paint.

The second fix

Start TBCExpected to end TBC

As soon as the plasterers and carpenters have completed the dry lining, the skilled workers will return to convert wires into sockets, and pipes into taps.

Kitchen and bathroom installation

Start March 2025Expected to end March 2025

During this process, the team will install the kitchens, bathrooms and internal doors, skirtings and architraves.

Wall tiling

Start March 2025Expected to end April 2025

Tiles will be added to the kitchen and bathroom walls.

Powering up

Start May 2025Expected to end June 2025

For the first time the building will be connected to the grid. Water, gas and electricity will flow through its pipes, and there will be light, heat, and hot and cold water.

Decoration and flooring

Start June 2025Expected to end June 2025

At this point the painters and decorators will return to add the final touches to the interiors. At this stage, the project is in the final phase of preparation for the first householders. Before we can allow anyone to cross the threshold, however, we have our own housekeeping to complete. Next stage: The completed build.

Clarion Housing Association Limited is registered with Regulator of Social Housing (4865); and is a Charitable Community Benefit Society under the Co-operative and Community Benefit Societies Act 2014 (7686) and affiliated to The National Housing Federation, and G15 (London’s 15 largest housing associations). VAT no 675646394. Clarion Housing Association Limited’s registered office is at Level 5, Greater London House, Hampstead Road, London NW1 7QX.
Clarion Housing Association Limited is authorised and regulated by the Financial Conduct Authority (FRN 792463)


Our group sites

© 2024 Clarion Housing - All right reserved
Powered by

Cookie Control

We use necessary cookies to make our site work. We would also like to use optional cookies to improve our online services, give you the best website experience possible and deliver tailored content, on and off our site. We will not set any optional cookies unless you enable them.


Necessary Cookies

Some cookies are needed for the website to work – for instance when the site requires login access, we use cookies so that you aren’t required to enter them again as you move throughout the website. You can’t switch these cookies off.


Analytics Cookies

We use these cookies to track and analyse how you use our website. For example, which pages you visit, or whether you view content or download documents. We use this information to improve our online services and give you the best website experience possible through more relevant and personalised content. You can switch these cookies on or off at any time. Third-party analytics are set by Google Analytics. For more information visit Google Analytics privacy policy.

We use cookies - to ensure that we give you the best experience on our website. By accepting we'll assume that you are happy to receive all cookies on our website. However, if you would like to, you can change your cookies settings at any time.

Manage Cookies